The EH zone in Toronto: Employment Heavy Industrial Zone
City of Toronto Zoning By-law 569-2013, Section 60.30. The zone covers 96 areas of the City's zoning map. Look up an address's zone.
The EH zone in plain language
The Employment Heavy Industrial Zone (EH) is regulated by Section 60.30 of the City of Toronto Zoning By-law 569-2013. This zone permits heavy industrial uses and sets standards for land uses, buildings, and structures within the zone. The numerical value following the EH symbol on the zoning map indicates the maximum floor space index allowed on a lot.
What the zone permits
The EH zone permits a range of industrial and service uses including ambulance depots, animal shelters, bindery, building supply yards, carpenter's shops, chemical materials storage, cold storage, contractors establishments, custom workshops, dry cleaning or laundry plants, fire halls, fuel storage, industrial sales and service uses, laboratories, most manufacturing uses except ammunition, firearms or fireworks factories, crude petroleum oil or coal refineries, explosives factories, and tanneries. Police stations, public utilities, public works yards, recovery facilities, service shops, shipping terminals, vehicle depots, vehicle repair shops, warehouses, and waste transfer stations are also permitted. Certain uses like cogeneration energy, crematoriums, marihuana production facilities, open storage, outside operations, propane transfer facilities, renewable energy, transportation uses, and vehicle service shops are permitted only if they meet specific conditions. Lawfully existing places of worship are permitted under certain conditions.
Main building rules
The minimum lot frontage in the EH zone is 30.0 metres, but lawfully existing lots with less frontage may keep their existing frontage (60.30.30.20 and 60.30.30.21). Maximum building height depends on the Height Overlay Map; if a numerical value follows the letters "HT" on the map, that value in metres is the maximum height, otherwise no height limit applies (60.30.40.10). Parapet walls for green roofs may exceed the maximum height by 2.0 metres (60.30.40.10(2)). Minimum front and side yard setbacks are 3.0 metres, and the minimum rear yard setback is 7.5 metres (60.30.40.70). A minimum building setback of 15.0 metres applies from lots abutting residential zones (60.30.40.70(4)). Loading or unloading buildings at railway tracks have no minimum side or rear setbacks from the railway right-of-way (60.30.40.70(5)). Loading spaces cannot be located in yards abutting residential zones (60.30.90.10).
Houseplexes, suites and more homes on a lot
The EH zone text does not address dwelling units or residential uses, and it does not mention houseplexes, duplexes, triplexes, fourplexes, secondary suites, garden suites, laneway suites, or additional dwelling units. Therefore, this section does not permit or regulate residential dwellings.
This explanation was written with the help of AI from the by-law text of City of Toronto Zoning By-law 569-2013, Section 60.30, office consolidation, version date July 31, 2024, including City-wide Amendments up to April 30, 2026, and checked against that text. It is a summary: the by-law governs, and a site-specific exception can change any rule for a particular property. Read Section 60.30 of the by-law.
The by-law's own lists for the EH zone
Permitted uses (Regulation 60.30.20.10(1))
- Ambulance Depot
- Animal Shelter
- Bindery
- Building Supply Yards
- Carpenter's Shop
- Chemical Materials Storage
- Cold Storage
- Contractors Establishment
- Custom Workshop
- Dry Cleaning or Laundry Plant
- Fire Hall
- Fuel Storage
- Industrial Sales and Service Use
- Laboratory
- All Manufacturing Uses, with the exceptions listed in the clause
- Police Station
- Public Utility
- Public Works Yard
- Recovery Facility
- Service Shop
- Shipping Terminal
- Vehicle Depot
- Vehicle Repair Shop
- Warehouse
- Waste Transfer Station
9 further uses are permitted if they comply with the conditions the by-law sets for each. (Regulation 60.30.20.20(1))
Homes for sale in EH zones
No homes are listed for sale in EH zones in Toronto right now. Each listing's zone is read from its position on the map; check the zone of a particular lot with the City.
Other employment zones in Toronto
Own a home in Toronto?
See what homes in Toronto are selling for and get an estimate for yours.
Talk to a Valery agent in Toronto
Your note goes to a Valery agent, who can answer by email or phone.
About these pages
Zone map: City of Toronto Open Data, Zoning By-law dataset (Zoning Area; the City's notes say it includes amendments up to June 18, 2023), as published February 20, 2026. Contains information licensed under the Open Government Licence – Toronto. Zone names, permitted uses and the explanations come from City of Toronto Zoning By-law 569-2013 (office consolidation, July 31, 2024, including City-wide Amendments up to April 30, 2026).
Zoning can change, and site-specific exceptions, minor variances and other approvals exist that a zone does not show. Confirm a property's zoning with the City before relying on it.
City of Toronto interactive zoning map · City of Toronto Zoning By-law 569-2013